Almost every extension needs a building approval, and some also need council planning approval. Here's how the approvals fit together and what can affect yours.
The short answer is yes. Almost every home extension needs at least one approval before work starts. The good news is that for most straightforward extensions the process is well established, and a good builder will manage it for you. Here’s how it works.
Building approval: needed for almost every extension
A building approval confirms your extension meets the building rules: structure, fire safety, energy efficiency, stair and balustrade safety, and so on. In Queensland, building approvals are issued by a building certifier, usually a private certifier engaged for your project.
To assess your extension, the certifier will need:
- Architectural or design drawings
- Structural engineering, including footings and framing
- A soil test for any new footings
- Energy efficiency information for new habitable rooms
The certifier also carries out inspections at key stages during the build and issues final paperwork when the work is complete.
Planning (council) approval: needed in some cases
Many extensions don’t need a separate planning approval from council, because they meet the standard rules in the planning scheme. You may need one, though, if your extension:
- Is on a property with a character or heritage overlay, which is common for pre-war homes in older Brisbane suburbs
- Is in a flood overlay area, where floor levels and uses on lower levels can be restricted
- Goes outside the usual height, setback or site cover limits for your zone
- Involves removing or changing protected vegetation
Some setback or siting issues can be handled by the building certifier with a “concurrence” referral to council rather than a full planning application. Your designer or certifier can tell you which path applies.
Plumbing approval
If the extension includes a bathroom, laundry or kitchen, the plumbing and drainage work also needs to be approved and inspected. This is normally handled as part of the project by your licensed plumber.
How long do approvals take?
For a straightforward extension with no overlays, building approval can often be organised within a few weeks once drawings and engineering are complete. If council planning approval is needed, allow more time, often a couple of months or longer depending on the application. That’s why it pays to start the design and approvals early, especially if you want to be building at a particular time of year.
What happens if you build without approval?
Unapproved building work can cause real problems: insurance issues, trouble when you sell, and in some cases council requiring the work to be fixed or removed. It’s never worth the risk.
How ADG handles approvals
Our extension projects start with a preliminary stage, where we coordinate design, engineering, soil testing and certification before building begins. You get a clear picture of what’s needed for your property, and the build starts with approvals in place. Most of our extensions take 6 to 12 months on site, depending on size and complexity.
Read Planning a home extension? Start here for the full process, see our home extensions, or book an onsite consultation.
This article is general information only. Approval requirements depend on your property and the current planning scheme, so check the rules for your address or ask your certifier.